Greenway NewsWorks continuing at pace along the new section of greenway from Omeath to Victoria Lock. Posted on November 21, 2023September 16, 2025 by LCC 21 NovWorks continuing at pace along the new section of greenway from Omeath to Victoria Lock. Culvert installed at Lower Shore Road Sub-base gravel install at Omra Park Final surfacing begins LCC Victoria Lock Car-park & Greenway Closed for Construction & Maintenance WorksNotification of Intention to Carry Out Renewal Works on Existing Omeath to Carlingford Greenway